Exhibit 10.8
|
AWARD/CONTRACT
|
1.
|
THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)
|
RATING
DO-A3
|
PAGE OF PAGES
1 97
|
|
2. CONTRACT (Proc. Inst.
Ident.) NO. N00024-09-C-4207
|
3.
|
EFFECTIVE DATE
28 Jan 2009
|
4. REQUISITION/PURCHASE REQUEST/PROJECT NO.
N0002408NR59422
|
|
|
|
|
|
|
|
5. ISSUED BY
|
CODE
|
|
N00024
|
6. ADMINISTERED BY (If other than
Item 5)
|
CODE S2206A
|
|
NAVAL SEA SYSTEMS COMMAND
|
DCMA BOSTON
|
|
|
1333 ISAAC HULL AVE SE - MAIL STOP
2030
|
495 SUMMER STREET
|
|
|
WASHINGTON NAVY YARD DC
20376-2030
|
BOSTON MA 02210-2138
|
|
|
|
|
|
|
7. NAME AND ADDRESS OF
CONTRACTOR (No., street, city, county, state and zip
code)
|
|
|
BEACON POWER
|
|
8.
|
DELIVERY
|
|
65 MIDDLESEX ROAD
|
|
|
o FOB ORIGIN
x
OTHER (See
below)
|
|
TYNGSBORO MA 01879
|
|
9.
|
DISCOUNT FOR PROMPT PAYMENT
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10.
|
SUBMIT INVOICES
|
ITEM
|
|
|
|
(4 copies unless otherwise
specified)
|
Block 12
|
|
|
|
TO THE ADDRESS
|
|
CODE 3EFH5
|
FACILITY CODE
|
|
SHOWN IN:
|
|
11. SHIP TO/MARK FOR
|
CODE
|
|
12. PAYMENT WILL BE MADE BY
|
CODE
|
HQ0337
|
|
|
DFAS COLUMBUS CENTER, NORTH
ENTITLEMENT
|
|
|
|
P.O. BOX 18224
|
|
|
|
COLUMBUS OH 43218-2264
|
|
|
See Schedule
|
|
|
|
|
|
|
|
13.
|
AUTHORITY FOR USING OTHER THAN FULL
AND OPEN
|
14.
|
ACCOUNTING AND APPROPRIATION DATA
|
|
|
COMPETITION:
|
See Schedule
|
|
|
o 10 U.S.C.
2304(c)( )
o
41 U.S.C.
253(c)( )
|
|
|
|
|
|
|
|
15A. ITEM NO.
|
15B. SUPPLIES/ SERVICES
|
15C. QUANTITY
|
15D. UNIT
|
15E. UNIT PRICE
|
15F. AMOUNT
|
|
|
|
|
|
|
|
|
|
SEE SCHEDULE
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15G. TOTAL AMOUNT OF
CONTRACT
|
$3,014,163.00
|
|
|
|
|
|
|
16. TABLE OF CONTENTS
|
|
(X)
|
SEC.
|
DESCRIPTION
|
PAGE(S)
|
(X)
|
SEC.
|
DESCRIPTION
|
PAGE(S)
|
|
|
|
PART I - THE
SCHEDULE
|
|
|
|
PART II - CONTRACT
CLAUSES
|
|
|
x
|
A
|
SOLICITATION/ CONTRACT
FORM
|
1
|
x
|
I
|
CONTRACT CLAUSES
|
30 - 96
|
|
x
|
B
|
SUPPLIES OR SERVICES AND
PRICES/
|
2 - 11
|
PART III - LIST OF DOCUMENTS,
EXHIBITS AND OTHER ATTACHMENTS
|
|
|
|
COSTS
|
|
x
|
J
|
LIST OF ATTACHMENTS
|
97
|
|
x
|
C
|
DESCRIPTION/ SPECS./ WORK
STATEMENT
|
12 - 20
|
PART IV - REPRESENTATIONS AND
INSTRUCTIONS
|
|
|
x
|
D
|
PACKAGING AND MARKING
|
21
|
|
K
|
REPRESENTATIONS, CERTIFICATIONS AND
|
|
|
x
|
E
|
INSPECTION AND ACCEPTANCE
|
22
|
|
|
OTHER STATEMENTS OF OFFERORS
|
|
|
x
|
F
|
DELIVERIES OR PERFORMANCE
|
23
|
|
L
|
INSTRS., CONDS., AND NOTICES TO
OFFERORS
|
|
|
x
|
G
|
CONTRACT ADMINISTRATION
DATA
|
24
|
|
M
|
EVALUATION FACTORS FOR AWARD
|
|
|
x
|
H
|
SPECIAL CONTRACT
REQUIREMENTS
|
25 - 29
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONTRACTING OFFICER WILL COMPLETE ITEM 17 OR 18
AS APPLICABLE
|
|
17. x CONTRACTOR’S NEGOTIATED AGREEMENT
Contractor is required to sign this document and return 1
copies to issuing
office. ) Contractor agrees to furnish and deliver all items or
perform all the services set forth or otherwise identified above
and on any continuation sheets for the consideration stated herein.
The rights and obligations of the parties to this contract shall be
subject to and governed by the following documents: (a) this
award/contract, (b) the solicitation, if any, and
(c) such provisions, representations, certifications, and
specifications, as are attached or incorporated by reference
herein.
(Attachments are listed herein.)
|
|
18. o AWARD ( Contractor is not required to sign
this document .) Your offer on Solicitation Number
including the additions or changes made by you
which additions or changes are set forth in full above, is hereby
accepted as to the items listed above and on any continuation
sheets. This award consummates the contract which consists of the
following documents: (a) the Government’s solicitation
and your offer, and (b) this award/contract. No further
contractual document is necessary.
|
|
19A. NAME AND TITLE OF SIGNER (Type or
print)
|
|
20A. NAME OF CONTRACTING OFFICER
|
|
|
|
TIMOTHY A. STARKER / SEA 024 - CONTRACTING
OFFICER
|
|
|
|
TEL: 202-781-3944
|
EMAIL: Timothy.Starker@navy.mil
|
|
19B. NAME OF CONTRACTOR
|
19C. DATE SIGNED
|
|
20B. UNITED STATES OF AMERICA
|
|
|
|
|
|
|
BY
|
|
|
|
BY
|
/s/ Timothy A. Starker
|
20C. DATE SIGNED
|
|
|
(Signature of person authorized to
sign)
|
|
|
|
(Signature of Contracting
Officer)
|
28-Jan-2009
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NSN 7540-01-152-8069
|
26-107
|
|
STANDARD FORM 26 (REV 12/2002)
|
|
Previous edition is usable
|
GPO 1985 O - 469-794
|
|
Prescribed by GSA
|
|
|
|
|
FAR (48 CFR) 53.214(a)
|
1
Section B - Supplies or
Services and Prices
|
ITEM NO
|
|
SUPPLIES/SERVICES
|
|
QUANTITY
|
|
UNIT
|
|
UNIT PRICE
|
|
AMOUNT
|
|
|
0001
|
|
|
|
|
|
Lot
|
|
|
|
$
|
901,748.00
|
|
|
|
|
Integrated Power System
|
|
|
|
|
|
|
|
|
|
|
|
|
Research and Development activities
associated with the development of Flywheel Energy Storage for Next
Generation Integrated Power Systems
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Destination
|
|
|
|
|
|
|
|
|
|
|
|
|
PURCHASE REQUEST NUMBER:
N0002408NR59422
|
|
|
|
|
|
|
|
|
|
|
|
|
CPFF
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED COST
|
|
$
|
828,411.00
|
|
|
|
|
|
|
|
|
|
|
FIXED FEE
|
|
$
|
73,337.00
|
|
|
|
|
|
|
|
|
|
|
TOTAL EST COST + FEE
|
|
$
|
901,748.00
|
|
|
ITEM NO
|
|
SUPPLIES/SERVICES
|
|
QUANTITY
|
|
UNIT
|
|
UNIT PRICE
|
|
AMOUNT
|
|
|
0001
|
|
|
|
|
|
|
|
|
|
$
|
0.00
|
|
|
|
|
Funding
|
|
|
|
|
|
|
|
|
|
|
|
|
To add a line of
accounting.
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Destination
|
|
|
|
|
|
|
|
|
|
|
|
|
CPFF
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED COST
|
|
$
|
0.00
|
|
|
|
|
|
|
|
|
|
|
FIXED FEE
|
|
$
|
0.00
|
|
|
|
|
|
|
|
|
|
|
TOTAL EST COST + FEE
|
|
$
|
0.00
|
|
|
|
|
ACRN AA
|
|
|
|
|
|
|
|
$
|
500,000.00
|
|
2
|
ITEM NO
|
|
SUPPLIES/SERVICES
|
|
QUANTITY
|
|
UNIT
|
|
UNIT PRICE
|
|
AMOUNT
|
|
|
0002
|
|
|
|
|
|
|
|
|
|
NSP
|
|
|
|
|
Data
|
|
|
|
|
|
|
|
|
|
|
|
|
Data for CLIN 0001 in accordance
with the attached DD Form 1423. Not separately priced.
Price to be included in the prices of CLIN 0001
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Destination
|
|
|
|
|
|
|
|
|
|
|
|
|
PURCHASE REQUEST NUMBER:
N0002408NR59422
|
|
|
|
|
|
|
|
|
|
|
|
|
CPFF
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED COST
|
|
$
|
0.00
|
|
|
|
|
|
|
|
|
|
|
FIXED FEE
|
|
$
|
0.00
|
|
|
|
|
|
|
|
|
|
|
TOTAL EST COST + FEE
|
|
$
|
0.00
|
|
|
ITEM NO
|
|
SUPPLIES/SERVICES
|
|
QUANTITY
|
|
UNIT
|
|
UNIT PRICE
|
|
AMOUNT
|
|
|
0003
|
|
|
|
|
|
Hours
|
|
|
|
$
|
2,112,415.00
|
|
|
|
|
Engineering Services
|
|
|
|
|
|
|
|
|
|
|
|
|
(SEE Note A)
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Destination
|
|
|
|
|
|
|
|
|
|
|
|
|
PURCHASE REQUEST NUMBER:
N0002408NR59422
|
|
|
|
|
|
|
|
|
|
|
|
|
CPFF
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED COST
|
|
$
|
1,938,928.00
|
|
|
|
|
|
|
|
|
|
|
FIXED FEE
|
|
$
|
173,487.00
|
|
|
|
|
|
|
|
|
|
|
TOTAL EST COST + FEE
|
|
$
|
2,112,415.00
|
|
3
|
ITEM NO
|
|
SUPPLIES/SERVICES
|
|
QUANTITY
|
|
UNIT
|
|
UNIT PRICE
|
|
AMOUNT
|
|
|
0004
|
|
|
|
|
|
Lot
|
|
|
|
$
|
0.00
|
|
|
|
|
Support for Engineering
Services
|
|
|
|
|
|
|
|
|
|
|
|
|
COST
|
|
|
|
|
|
|
|
|
|
|
|
|
(Cost only) (See Note B)
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Destination
|
|
|
|
|
|
|
|
|
|
|
|
|
PURCHASE REQUEST NUMBER:
N0002408NR59422
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ESTIMATED COST
|
|
$
|
0.00
|
|
CLAUSES INCORPORATED BY FULL
TEXT
LIMITATION OF COST/LIMITATION OF FUNDS (NAVSEA)
(SEP 1990)
The clause entitled “LIMITATION OF
COST” (FAR 52.232-20) or “LIMITATION OF FUNDS”
(FAR 52.232-22), as appropriate, shall apply separately and
independently to each separately identified estimated
cost.
CLAUSES INCORPORATED BY FULL
TEXT
NOTE A - The Government will fund these items as needed
during the contract performance via Technical Instructions.
Engineering Services includes incidental materials (See
Section C).
NOTE B: The Government will fund this item as
needed during contract performance. Support for Engineering
Services includes travel and subsistence (See Section C) on a
cost only basis, with no provision for fee.
CLAUSES INCORPORATED BY FULL
TEXT
PAYMENT FOR ENGINEERING SERVICES AND SUPPORT
(NAVSEA) (JAN 2008)
(Applicable to CLINs 0003 and 0004)
(a) Invoices for engineering
services and overtime shall contain the name(s) of
engineer(s), date(s) and place(s) of performance, and a
brief description of the services performed. This information
may be included in the Comments tab of the applicable WAWF
document. Each invoice shall be accompanied by a copy of the
authorization for services and the original certification of
performance. These documents may be attached to the invoice
as described in the Invoice Instructions in Section G. A
copy of each invoice shall be furnished to the applicable
NAVSEA/DRPM/PEO code identified in Section C under Engineering
Services.
4
(b) Invoices for subsistence and
transportation shall be supported by a statement of actual costs
incurred by the Contractor and claimed to be reimbursable and shall
be in such form and reasonable detail as required by the cognizant
Defense Contract Audit Agency (DCAA). The Government shall
make provisional payment after submission of each invoice and
statement of costs. At any time prior to final payment, DCAA
may audit the invoice(s) and statement(s) of costs, as
appropriate.
(c) Each provisional payment for
subsistence and transportation costs shall be subject to reduction
to the extent any amount included in the related invoice and
statement of costs is found not to be reimbursable under the
support item(s) and shall also be subject to reduction for
overpayment or to increase for underpayment on preceding
invoices. Any disputes under this requirement shall be
determined in accordance with the clause of this contract entitled
“DISPUTES” (FAR 52.233-1).
CLAUSES INCORPORATED BY FULL
TEXT
252.204-7006 BILLING INSTRUCTIONS
(OCT 2005)
When submitting a request for payment, the
Contractor shall—
(a) Identify the contract line
item(s) on the payment request that reasonably reflect
contract work performance; and
(b) Separately identify a payment amount
for each contract line item included in the payment
request.
(End of clause)
CLAUSES INCORPORATED BY FULL
TEXT
252.232-7003 ELECTRONIC
SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (MAR
2008)
(a) Definitions. As used in this
clause—
(1) Contract financing payment and invoice
payment have the meanings given in section 32.001 of the Federal
Acquisition Regulation.
(2) Electronic form means any automated
system that transmits information electronically from the
initiating system to all affected systems. Facsimile, e-mail, and
scanned documents are not acceptable electronic forms for
submission of payment requests. However, scanned documents are
acceptable when they are part of a submission of a payment request
made using Wide Area WorkFlow (WAWF) or another electronic form
authorized by the Contracting Officer.
(3) Payment request means any request for
contract financing payment or invoice payment submitted by the
Contractor under this contract.
5
(b) Except as provided in paragraph
(c) of this clause, the Contractor shall submit payment
requests and receiving reports using WAWF, in one of the following
electronic formats that WAWF accepts: Electronic Data Interchange,
Secure File Transfer Protocol, or World Wide Web input. Information
regarding WAWF is available on the Internet at
https://wawf.eb.mil/.
(c) The Contractor may submit a payment
request and receiving report using other than WAWF only
when—
(1) The Contracting Officer authorizes use
of another electronic form. With such an authorization, the
Contractor and the Contracting Officer shall agree to a plan, which
shall include a timeline, specifying when the Contractor will
transfer to WAWF;
(2) DoD is unable to receive a payment
request or provide acceptance in electronic form;
(3) The Contracting Officer administering
the contract for payment has determined, in writing, that
electronic submission would be unduly burdensome to the Contractor.
In such cases, the Contractor shall include a copy of the
Contracting Officer’s determination with each request for
payment; or
(4) DoD makes payment for commercial
transportation services provided under a Government rate tender or
a contract for transportation services using a DoD-approved
electronic third party payment system or other exempted vendor
payment/invoicing system (e.g., PowerTrack, Transportation
Financial Management System, and Cargo and Billing
System).
(d) The Contractor shall submit any
non-electronic payment requests using the method or methods
specified in Section G of the contract.
(e) In addition to the requirements of this
clause, the Contractor shall meet the requirements of the
appropriate payment clauses in this contract when submitting
payments requests.
(End of clause)
CLAUSES INCORPORATED BY FULL
TEXT
EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC
1995)
(a) As part of the negotiated fixed price
or total estimated amount of this contact, both the Government and
the Contractor have agreed to waive any entitlement that otherwise
might accrue to either party in any residual dollar amount of $500
or less at the time of final contract closeout. The term
“residual dollar amount” shall include all money that
would otherwise be owed to either party at the end of the contract,
except that, amounts connected in any way with taxation,
allegations of fraud and/or antitrust violations shall be
excluded. For purposes of determining residual dollar
amounts, offsets of money owed by one party against money that
would otherwise be paid by that party may be considered to the
extent permitted by law.
(b) This agreement to waive entitlement to
residual dollar amounts has been considered by both parties.
It is agreed that the administrative costs for either party
associated with collecting such small dollar amounts could exceed
the amount to be recovered.
6
CLAUSES INCORPORATED BY FULL
TEXT
PAYMENTS OF FEE (S) (COMPLETION) (NAVSEA)
(MAY 1993)
(Applicable to CLINs 0001 and 0002)
(a) For purposes of this contract,
“fee” means “target fee” in
cost-plus-incentive-fee type contracts, “base fee” in
cost-plus-award-fee type contracts, “fixed fee” in
cost-plus-fixed-fee type contracts for completion and phase type
contracts.
(b) The Government shall make payments to
the Contractor, subject to and in accordance with the clause in
this contract entitled “FIXED FEE” (FAR 52.216-8) or
“INCENTIVE FEE”, (FAR 52.216-10), as applicable.
Such payments shall be equal to nine percent ( 9% )
of the allowable cost of each invoice submitted by and payable to
the Contractor pursuant to the clause of this contract entitled
“ALLOWABLE COST AND PAYMENT” (FAR 52.216-7), subject to
the withholding terms and conditions of the “FIXED FEE”
or “INCENTIVE FEE” clause, as applicable (percentage of
fee is based on fee dollars divided by estimated cost dollars,
including facilities capital cost of money). Total
fee(s) paid to the Contractor shall not exceed the fee
amount(s) set forth in this contract.
(c) In the event of discontinuance of the
work under this contract, or any specified phase of the contract,
in accordance with the clause of this contract entitled
“LIMITATION OF FUNDS” (FAR 52.232-22) or
“LIMITATION OF COST” (FAR 52.232-20), as applicable,
the fee shall be equitably adjusted by mutual agreement to reflect
the diminution of work. If the adjusted fee is less than the
sum of all fee payments made to the Contractor under this contract,
the Contractor shall repay the excess amount to the
Government. If the adjusted fee exceeds all payments made to
the Contractor under this contract, the Contractor shall be paid
the additional amount, subject to the availability of funds.
In no event shall the Government be required to pay the Contractor
any amount in excess of the funds obligated under this contract at
the time of the discontinuance of work.
(d) Fee(s) withheld pursuant to the
terms and conditions of this contract shall not be paid until the
contract has been modified to reduce the fee(s) in accordance
with paragraph (c) above, or until the Procuring Contracting
Officer has advised the paying office in writing that no fee
adjustment is required.
CLAUSES INCORPORATED BY FULL
TEXT
PAYMENTS OF FEE(S) (LEVEL OF EFFORT)
(NAVSEA) (MAY 1993)
(Applicable to CLIN 0003)
(a) For purposes of this contract,
“fee” means “target fee” in
cost-plus-incentive-fee type contracts, “base fee” in
cost-plus-award-fee type contracts, or “fixed fee” in
cost-plus-fixed-fee type contracts for level of effort type
contracts.
(b) The Government shall make payments to
the Contractor, subject to and in accordance with the clause in
this contract entitled “FIXED FEE” (FAR 52.216-8) or
“INCENTIVE FEE”, (FAR 52.216-10), as applicable.
Such payments shall be equal to nine percent ( 9 %)
of the allowable cost of each invoice submitted by and payable to
the Contractor pursuant to the clause of this contract entitled
“ALLOWABLE COST AND PAYMENT” (FAR 52.216-7), subject to
the withholding terms and conditions of the “FIXED FEE”
or “INCENTIVE FEE” clause.
(c) The fee(s) specified in
SECTION B, and payment thereof, is subject to adjustment
pursuant to paragraph (g) of the special contract requirement
entitled “LEVEL OF EFFORT.” If the fee(s) is
reduced and the reduced fee(s) is less than the sum of all fee
payments made to the Contractor under this contract, the Contractor
shall repay the excess amount to the Government. If the final
adjusted fee exceeds all fee payments made to the contractor under
this contract, the Contractor shall be paid the additional amount,
subject to the availability of funds. In no event shall the
Government be
7
required to pay the Contractor any amount in
excess of the funds obligated under this contract at the time of
the discontinuance of work.
(d) Fee(s) withheld pursuant to the
terms and conditions of this contract shall not be paid until the
contract has been modified to reduce the fee(s) in accordance
with the “LEVEL OF EFFORT” special contract
requirement, or until the Procuring Contracting Officer has advised
the paying office in writing that no fee adjustment is
required.
CLAUSES INCORPORATED BY FULL
TEXT
TRAVEL COSTS - ALTERNATE I (NAVSEA) (DEC
2005)
(a) Except as otherwise provided herein,
the Contractor shall be reimbursed for its reasonable actual travel
costs in accordance with FAR 31.205-46. The costs to be
reimbursed shall be those costs accepted by the cognizant
DCAA.
(b) Reimbursable travel costs include only
that travel performed from the Contractor’s facility to the
worksite, in and around the worksite, and from the worksite to the
Contractor’s facility.
(c) Relocation costs and travel costs
incident to relocation are allowable to the extent provided in FAR
31.205-35; however, Contracting Officer approval shall be required
prior to incurring relocation expenses and travel costs incident to
relocation.
(d) The Contractor shall not be reimbursed
for the following daily local travel costs:
(i) travel at U.S. Military
Installations where Government transportation is
available,
(ii) travel performed for
personal convenience/errands, including commuting to and from work,
and
(iii) travel costs incurred in
the replacement of personnel when such replacement is accomplished
for the Contractor’s or employee’s
convenience.
CLAUSES INCORPORATED BY FULL
TEXT
CONTRACT SUMMARY FOR PAYMENT OFFICE (COST TYPE)
(FEB 1997)
This entire contract is cost type.
Note: This is a Cost Plus Fixed Fee Completion
(CLIN 0001) and a Cost Plus Fixed Fee, Level of Effort (CLIN 0003)
type contract.
|
ITEM
|
|
ESTIMATED COST
|
|
FIXED FEE
|
|
TOTAL AMOUNT
|
|
MAN-HOURS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GRAND TOTAL
|
|
$
|
2,767,339
|
|
$
|
246,824
|
|
$
|
3,014,163
|
|
14,196
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8
CLAUSES INCORPORATED BY FULL
TEXT
PAYMENT INSTRUCTIONS FOR MULTIPLE ACCOUNTING
CITATIONS (NAVSEA) (JAN 2008)
Applicable to ( CLINs 0001, 0003 and 0004
)
For contracts or orders that 1) include contract
line items that are funded by multiple accounting classification
citations for which a contract line item or items are not broken
out into separately identifiable subline items (informational
subline items are not separately identifiable subline items); 2)
contain cost-reimbursement or time-and-material or labor-hour line
items; or 3) authorize financing payments, the payment office will
make payment from each ACRN within the contract or order in the
same proportion as the amount of funding currently unliquidated for
each ACRN (c ontract-wide: proration) .
CLAUSES INCORPORATED BY FULL TEXT
INVOICE INSTRUCTIONS (NAVSEA) (JAN
2008)
(a) In accordance with the clause of this
contract entitled “ELECTRONIC SUBMISSION OF PAYMENT
REQUESTS” (DFARS 252.232-7003), the Naval Sea Systems Command
(NAVSEA) will utilize the DoD Wide Area Workflow Receipt and
Acceptance (WAWF) system to accept supplies/services delivered
under this contract. This web-based system located at
https://wawf.eb.mil provides the technology for government
contractors and authorized Department of Defense (DoD) personnel to
generate, capture and process receipt and payment-related
documentation in a paperless environment. Invoices for
supplies/services rendered under this contract shall be submitted
electronically through WAWF. Submission of hard copy
DD250/invoices may no longer be accepted for payment.
(b) It is recommended that the person in
your company designated as the Central Contractor Registration
(CCR) Electronic Business (EB) Point of Contact and anyone
responsible for the submission of invoices, use the online training
system for WAWF at http://wawftraining.com. The Vendor, Group
Administrator (GAM), and sections marked with an asterisk in the
training system should be reviewed. Vendor Quick Reference
Guides also are available at
http://acquisition.navy.mil/navyaos/content/view/full/3521/.
The most useful guides are “Getting Started for
Vendors” and “WAWF Vendor Guide”.
(c) The designated CCR EB point of contact
is responsible for activating the company’s CAGE code on WAWF
by calling 1-866-618-5988. Once the company is activated, the
CCR EB point of contact will self-register under the
company’s CAGE code on WAWF and follow the instructions for a
group administrator. After the company is set-up on WAWF, any
additional persons responsible for submitting invoices must
self-register under the company’s CAGE code at
https://wawf.eb.mil.
(d) The contractor shall use the following
document types, DODAAC codes and inspection and acceptance
locations when submitting invoices in WAWF:
9
Type of Document ( contracting
officer check all that apply )
|
o
|
Invoice (FFP Supply &
Service)
|
|
|
|
|
o
|
Invoice and Receiving Report Combo (FFP
Supply)
|
|
|
|
|
o
|
Invoice as 2-in-1 (FFP Service Only)
|
|
|
|
|
x
|
Cost Voucher (Cost Reimbursement,
T&M and LH)
|
|
|
|
|
o
|
Receiving Report (FFP, DD250 Only)
|
DODAAC Codes and Inspection and
Acceptance Locations ( contracting officer complete appropriate
information as applicable )
|
Issue DODAAC
|
|
N00024
|
|
|
|
|
|
Admin DODAAC
|
|
S2206A
|
|
|
|
|
|
Pay Office DODAAC
|
|
HQ0337
|
|
|
|
|
|
Inspector DODAAC
|
|
N00024
|
|
|
|
|
|
Service Acceptor DODAAC
|
|
N00024
|
|
|
|
|
|
Service Approver DODAAC
|
|
N00024
|
|
|
|
|
|
Ship To DODAAC
|
|
See Section F
|
|
|
|
|
|
DCAA Auditor DODAAC
|
|
HAA621
|
|
|
|
|
|
LPO DODAAC
|
|
|
|
|
|
|
|
Inspection Location
|
|
See Section E
|
|
|
|
|
|
Acceptance Location
|
|
See Section E
|
Attachments created in any Microsoft Office
product may be attached to the WAWF invoice, e.g., backup
documentation, timesheets, etc. Maximum limit for size of
each file is 2 megabytes. Maximum limit for size of files per
invoice is 5 megabytes.
(e) Before closing out of an invoice
session in WAWF, but after submitting the document(s), you will be
prompted to send additional email notifications. Click on
“Send More Email Notification” and add the
acceptor/receiver email addresses noted below in the first email
address block, and add any other additional email addresses desired
in the following blocks. This additional notification to the
government is important to ensure that the acceptor/receiver is
aware that the invoice documents have been submitted into
WAWF.
Send Additional Email
Notification To:
Joseph.tannenbaum@navy.mil
10
(f) The contractor shall submit
invoices/cost vouchers for payment per contract terms and the
government shall process invoices/cost vouchers for payment per
contract terms. Contractors approved by DCAA for direct
billing will submit cost vouchers directly to DFAS via WAWF.
Final voucher submission will be approved by the ACO.
(g) The WAWF system has not yet been
implemented on some Navy programs; therefore, upon written
concurrence from the cognizant Procuring Contracting Officer, the
Contractor is authorized to use DFAS’s WInS for electronic
end to end invoicing until the functionality of WInS has been
incorporated into WAWF.
(h) If you have any questions regarding
WAWF, please contact the WAWF helpdesk at the above 1-866 number or
the NAVSEA WAWF point of contact Margaret Morgan at (202) 781-4815
or margaret.morgan@navy.mil.
11
Section C - Descriptions and
Specifications
STATEMENT OF WORK
PART 1 — CONTRACT LINE
ITEM DESCRIPTION
Item 0001 — RESEARCH AND
DEVELOPMENT ACTIVITIES ASSOCIATED WITH FLYWHEEL ENERGY STORAGE IN
SUPPORT OF NAVAL INTEGRATED POWER SYSTEMS
1.1
The Contractor shall provide
services, materials, facilities and personnel necessary to perform
the tasks identified below.
1.2
The Contractor shall provide program
management, planning, control, subcontracts management, schedule
accounting and control, and cost accounting and control.
1.2.1
The Contractor shall develop and
maintain a Program Plan. The Program Plan shall include an
event-based schedule, reflecting how the effort will be executed,
including timing of reviews. The schedule shall be developed
in a manner that reflects the Contractor’s customary way of
organizing projects and the need to have a direct relationship
between project events and cost projections. The schedule
shall be maintained in Microsoft Project™ format and shall be
made available to the Navy electronically in Microsoft
Project™ and PDF formats at regular intervals during the
execution of the effort. The Contractor shall assess
potential risks associated with achievement of technical, cost, and
schedule requirements and define methods or alternatives to
mitigate or minimize these risks, including the identification of
criteria upon which decisions can be based. The Program Plan
shall include a monthly spend plan showing the expenditures
predicted throughout the period of performance. The spend
plan shall include a chart that shows funded and disbursed for the
total Contract and by CLIN and shall be updated in each progress
report.
1.3
The Contractor shall submit a
monthly Progress Report that reflects the technical, schedule, and
cost status of the effort. A copy of the latest invoice shall
be appended to the Progress Report. The Progress Report shall
contain the following information:
Planned efforts and
costs : The Contractor
shall provide a copy of the schedule established in the Program
Plan that has been updated to reflect changes to planned
tasks/milestones. The Contractor shall provide a brief description
of the work envisioned for the ensuing reporting period
highlighting any changes to the schedule, the objectives of those
efforts, and an estimate of costs and man-hours associated with
planned efforts. The Contractor shall note significant
accomplishments and identification of major problems/deficiencies
with impact and recommended solutions. The Contractor should
identify any technical risks/challenges or problems anticipated in
the next reporting period.
Actual efforts and
costs : The Contractor
shall provide a copy of the schedule updated to reflect work
performed during the current reporting period. The Navy
expects the Contractor to maintain one schedule that will be
updated monthly for both planned and actual efforts. The Contractor
shall detail work performed during the current reporting period and
associated financial status. Include an overall status of each
milestone, task, or unit of work. The Contractor shall
document significant results of conferences, trips, or directives
from the Government’s representatives. The Contractor
shall maintain an action list for programmatic and technical items
that arise during the course of the effort and a status of
deliverable items.
1.4
The Contractor shall plan, conduct
and document meetings and reviews held between the Navy and the
Contractor as necessary. The Contractor and the Navy shall
develop agendas for meetings jointly via electronic mail. The
Contractor shall prepare Meeting Minutes which document all
material presented, key discussions and decisions made, and any
action items which have arisen as a result of any meeting with the
Navy or the Navy’s representatives. Reviews shall be
coordinated with major milestones and shall be scheduled to occur
at a minimum of a quarterly basis. Contractor personnel shall
be available for informal conferences as required throughout
performance to discuss the direction, progress, and/or significant
problems encountered, and to discuss technical and fiscal
information required for performance. The Navy reserves the
right to conduct an in-plant visit to the
12
Contractor to review implementation of the
Contractor’s cost and schedule management system and to
understand the methods the Contractor utilizes to determine
progress. The intent is to ensure maximum visibility of the
Contractor’s technical, cost and schedule
performance.
1.5
Advanced System Architecture
Conceptual Assessment : The Contractor shall assist NAVSEA with
a system level analysis of future surface combatant electrical
power energy storage needs and shall identify three to four
candidate application(s) of a flywheel energy storage system
that offer the most benefit in terms of overall system development
and production cost, equipment volume and weight, and mission
performance improvements. The Contractor shall participate as part
of the Navy’s power plant upgrade architecture development
team by providing characterization of the flywheel energy storage
technologies under consideration so the team can include those
technologies in system level trade studies. The Contractor shall
independently validate the results of the trade studies. Based on
the results of this initial trade studies, the Contractor shall
perform a conceptual design of the notional flywheel energy storage
system. The Contractor shall develop simulation models for the
notional technologies.
Item 0002 — DATA
2.1
The data to be furnished hereunder
shall be prepared in accordance with the Contract Data Requirements
List, DD Form 1423, Exhibit A , attached
hereto.
2.2
Data shall be submitted to NAVSEA
PMS-320 in an electronic mailing using Microsoft Word, Microsoft
Excel, Microsoft PowerPoint, Microsoft Project, or PDF file formats
unless otherwise agreed to. No paper copy shall be delivered
unless otherwise agreed to by the Navy. The
Contractor’s format is acceptable, provided the technical
content requirement is met. The content requirements are
specified for each data item in the SOW.
2.3
For those items requiring approval,
approval will be based on technical content and compliance with the
SOW requirements. The Navy will make every effort to expedite
review and response to the contractor. Disapproved documents
shall be modified by the Contractor in accordance with the comments
provided by the Navy and resubmitted for Navy
reconsideration. Documents that are approved with comment may
be considered acceptable if the Contractor acknowledges acceptance
of the Navy’s comment.
Item 0003 - ENGINEERING SERVICES (NAVSEA)
(MAY 1998)
The Contractor shall, at the option of the
Government, furnish 10,000 man-hours of the services
of qualified engineers to perform Engineering Support for follow-on
investigations and hardware evaluations to determine the
effectiveness of the new technologies developed herein. A
requirement of a mix of lead, senior, and intermediate level
personnel in the ratio of 1:2:1 is anticipated, although the
Contractor’s requirement is to deliver the total amount of
support in such mix as required. The nature of the services
to be performed shall be non-severable from the scope of the
remaining aspects of the contract. As such, the manner of
work to be performed under this item shall be intimately related to
the core scope of the contract, shall form a logical extension of
the work otherwise performed (such as completion of testing of
articles developed or extending the performance capability of the
articles developed), or shall provide amplifying details of the
articles or technologies beyond that otherwise required herein and
shall result in a specific end-product, e.g. a report. The
services shall cover the investigation of potential alternative
technologies on suitable demonstration vehicles, working in support
of NAVSEA objectives. This effort shall be undertaken only as
directed by written technical instructions issued by the
COR.
The contractor shall furnish materials and
subcontracting incidental to the engineering services as necessary
to perform the efforts specified by PMS-320. The amount of
materials and subcontracting to be provided shall be equal or less
than $100,000 of direct costs. Incidental
materials and subcontracting shall be fee bearing.
The engineering services shall be performed
within the limits, if any, as to place(s) and
period(s) specified there for, as authorized by the
COR.
13
Each time services are performed, the
engineer(s) shall obtain a certification of performance from a
responsible U.S. Government official at the activity where the
services were performed, citing tasks satisfactorily performed and
hours worked each day.
The maximum liability of the Government for each
engineering services item shall not exceed the amount set forth in
the Schedule, or the amount obligated whichever is less. If,
at any time, the Contractor has reason to believe that the amounts
it expects to incur in the performance of each engineering services
item in the next succeeding sixty (60) days, when added to all
amounts previously incurred, will exceed seventy-five percent (75%)
of the amount then set forth in the Schedule; or if, at any time,
the Contractor has reason to believe that the man days and/or
amount for the full performance of each engineering services item
will be greater than or substantially less than that set forth in
the Schedule, the Contractor shall notify the Contracting Officer
in writing, giving its revised estimate of the man days and/or
amount for the performance of said item. The Contractor shall
not exceed the obligated amount for each engineering services item,
unless and until the Contracting Officer has increased such amount
in writing.
In the event the Government does not designate
time(s) and place(s) sufficient for performance of the
total quantity of engineering services set forth in the Schedule
within the period(s) provided there for, those services not
furnished shall be deemed to be terminated for the convenience of
the Government at no cost to the Government. Such termination
shall be evidenced by a written document signed by the Contracting
Officer and mailed or otherwise furnished to the
Contractor.
Performance of the work under this effort shall
be subject to written Technical Instructions (TIs) signed by the
COR. If, in the opinion of the Contractor, any technical
instruction calls for effort outside the scope of the contract or
is inconsistent with this requirement, the Contractor shall notify
the Government Contracting Officer in writing within ten
(10) working days after the receipt of any such
instruction. The Contractor shall not proceed with the work
affected by the technical instruction unless and until the
Government Contracting Officer notifies the Contractor that the
technical instruction is within the scope of this
contract.
Item 0004 - SUPPORT FOR ENGINEERING
SERVICES (NAVSEA) (JUN 1992)
(a) The Contractor shall be reimbursed for
its reasonable actual subsistence, transportation, and travel time
costs incurred in the performance of the related engineering
services item(s) in accordance with FAR 31.205-46. The
costs to be reimbursed shall be those costs accepted by the
cognizant DCAA.
(b) Overtime shall be performed as
required by the using activity and to the extent authorized by the
COR. Overtime premium to be negotiated as
required.
(c) The maximum liability of the
Government for each support item shall not exceed the estimated
amount set forth in the Schedule, or the amount obligated under the
SLIN, whichever is less. If, at any time, the Contractor has
reason to believe that the costs it expects to incur in the
performance of each support item in the next succeeding sixty (60)
days, when added to all costs previously incurred, will exceed
seventy-five percent (75%) of the amount then set forth in the
Schedule; or if, at any time, the Contractor has reason to believe
that the costs to the Government for the full performance of each
support item will be greater than or substantially less than the
amount set forth in the Schedule, the Contractor shall notify the
Contracting Officer in writing, giving its revised estimate of such
costs for the performance of said item. The Contracting
Officer may, upon receipt of such notice or whenever the
Contracting Officer considers it necessary, increase or further
increase the total estimated amount for the performance of each
support item. When and to the extent the estimated amount for
a support item has been so increased, any amounts expended or
incurred by the Contractor for performance in excess of the
estimated amount there for prior to the increase, shall be paid or
reimbursed to the same extent as if expended or incurred after the
increase.
COMPUTER SOFTWARE AND/OR COMPUTER
DATABASE(S) DELIVERED TO AND/OR RECEIVED FROM THE GOVERNMENT
(NAVSEA) (APR 2004)
14
(a)
The Contractor agrees to test for
viruses all computer software and/or computer databases, as defined
in the clause entitled “RIGHTS IN NONCOMMERCIAL COMPUTER
SOFTWARE AND NONCOMMERCIAL COMPUTER SOFTWARE DOCUMENTATION”
(DFARS 252.227-7014), before delivery of that computer software or
computer database in whatever media and on whatever system the
software is delivered. The Contractor warrants that any such
computer software and/or computer database will be free of viruses
when delivered.
(b)
The Contractor agrees to test any
computer software and/or computer database(s) received from
the Government for viruses prior to use under this
contract.
(c)
Unless otherwise agreed in writing,
any license agreement governing the use of any computer software to
be delivered as a result of this contract must be paid-up and
perpetual, or so nearly perpetual as to allow the use of the
computer software or computer data base with the equipment for
which it is obtained, or any replacement equipment, for so long as
such equipment is used. Otherwise the computer software or
computer database does not meet the minimum functional requirements
of this contract. In the event that there is any routine to disable
the computer software or computer database after the software is
developed for or delivered to the Government, that routine shall
not disable the computer software or computer database until at
least twenty-five calendar years after the delivery date of the
affected computer software or computer database to the
Government.
(d)
No copy protection devices or
systems shall be used in any computer software or computer database
delivered under this contract to restrict or limit the Government
from making copies. This does not prohibit license agreements
from specifying the maximum amount of copies that can be
made.
(e)
Delivery by the Contractor to the
Government of certain technical data and other data is now
frequently required in digital form rather than as hard copy.
Such delivery may cause confusion between data rights and computer
software rights. It is agreed that, to the extent that any
such data is computer software by virtue of its delivery in digital
form, the Government will be licensed to use that digital-form with
exactly the same rights and limitations as if the data had been
delivered as hard copy.
(f)
Any limited rights legends or other
allowed legends placed by a Contractor on technical data or other
data delivered in digital form shall be digitally included on the
same media as the digital-form data and must be associated with the
corresponding digital-form technical data to which the legends
apply to the extent possible. Such legends shall also be
placed in human readable form on a visible surface of the media
carrying the digital-form data as delivered, to the extent
possible.
CLAUSES INCORPORATED BY FULL
TEXT
Item(s) 0002 - The data to be
furnished hereunder shall be prepared in accordance with the
Contract Data Requirements List, DD Form 1423,
Exhibit(s) A , attached hereto.
ITEM(S) 0003 - ENGINEERING SERVICES
(NAVSEA) (APR 2004)
(a)
The Contractor shall furnish the
services of qualified engineer(s) to:
(1) Assist in planning,
installation, testing, checkout, adjustment, operation,
disassembly, and repair of Flywheel Energy Storage System ;
and
15
(2) Perform on-the-job
instruction and training of Navy personnel (military and/or
civilian). (Not applicable to SCN funded items).
(b) For purposes of this requirement, the
following definitions apply:
(1) “Domestic services” means
services rendered within the United States (U.S.) and/or on Navy
vessels in ports within the U.S. or at sea, provided the vessel
does not enter port outside the U.S.
(2) “Foreign
services”means services other than domestic.
(3) “United States”
means the United States, its possessions, Puerto Rico, and any
other place subject to its jurisdiction, but does not include
leased bases or trust territories.
(4) “Man day” means
the services of one engineer for one day of eight hours, Monday
through Friday (excluding holidays).
(5) “Holidays”
means all Federally recognized holidays.
(c) The engineering services shall be
performed within the limits, if any, as to place(s)and
period(s)specified therefor, as authorized by PMS 320
.
(d) When authorized under
paragraph(c) above, each engineer shall perform engineering
services in accordance with supplemental instructions provided by
the Contract Administration Office(CAO)cognizant of vessel
construction/conversion contract, a representative of the
authorizing activity or a representative of the activity where the
engineering services are performed, as applicable. However,
each engineer shall not be considered an employee of the
Government.
(e) Travel time necessary for performance
of such services shall be included in computing the man days of
service. When services are performed at sea and the
engineer(s) is unable to leave the vessel when work is
completed, the remaining time aboard the vessel shall be considered
travel time for purposes of computing the man days of
services. However, the Contractor shall be paid for no more
than one man day of service per calendar day for each engineer
while in travel status.
(f) Passports, visas, inoculations and
other medical requirements necessary for performance of engineering
services shall be at the sole responsibility and expense of the
Contractor.
(g) Each time services are performed, the
engineer(s)shall obtain a certification of performance from a
responsible U.S.Government official aboard the vessel or at the
activity where the services were performed, citing tasks
satisfactorily performed and hours worked each day.
(h) The maximum liability of the Government
for each engineering services item shall not exceed the amount set
forth in the Schedule, or the amount obligated whichever is less.
If, at any time, the Contractor has reason to believe that the
amounts it expects to incur in the performance of each engineering
services item in the next succeeding sixty(60)days, when added to
all amounts previously incurred, will exceed seventy-five
percent(75%)of the amount then set forth in the Schedule; or if, at
any time, the Contractor has reason to believe that the man days
and/or amount for the full performance of each engineering services
item will be greater than or substantially less than that set forth
in the Schedule, the Contractor shall notify the Contracting
Officer in writing, giving its revised estimate of the man days
and/or amount for the performance of said item. The Contractor
shall not exceed the obligated amount for each engineering services
item, unless and until such amount has been increased in writing by
the Contracting Officer.
(i) In the event the Government does not
designate time(s)and place(s)sufficient for performance of the
total quantity of engineering services set forth in the Schedule
within the period(s)provided therefor, those services not furnished
shall be deemed to be terminated for the convenience of the
Government at no cost to the Government. Such
16
termination shall be evidenced by a written
document signed by the Contracting Officer and mailed or otherwise
furnished to the contractor.
SUPPORT FOR ENGINEERING SERVICES (NAVSEA) (JUN
1992)
(a) The Contractor shall be reimbursed for
its reasonable actual subsistence and transportation costs incurred
in the performance of the related engineering services
item(s) in accordance with FAR 31.205-46. The costs to
be reimbursed shall be those costs accepted by the cognizant
DCAA.
(b) Overtime shall be performed as
required by the using activity and to the extent authorized by the
applicable NAVSEA/DRPM/PEO code identified in Section C under
Engineering Services.
(c) The maximum liability of the
Government for each support item shall not exceed the estimated
amount set forth in the Schedule. If, at any time, the
Contractor has reason to believe that the costs it expects to incur
in the performance of each support item in the next succeeding
sixty (60) days, when added to all costs previously incurred, will
exceed seventy-five percent (75%) of the amount then set forth in
the Schedule; or if, at any time, the Contractor has reason to
believe that the costs to the Government for the full performance
of each support item will be greater than or substantially less
than the amount set forth in the Schedule, the Contractor shall
notify the Contracting Officer in writing, giving its revised
estimate of such costs for the performance of said item. The
Contracting Officer may, upon receipt of such notice or whenever
the Contracting Officer considers it necessary, increase or further
increase the total estimated amount for the performance of each
support item. When and to the extent the estimated amount for
a support item has been so increased, any amounts expended or
incurred by the Contractor for performance in excess of the
estimated amount therefor prior to the increase, shall be paid or
reimbursed to the same extent as if expended or incurred after the
increase.
COMPUTER SOFTWARE AND/OR COMPUTER
DATABASE(S) DELIVERED TO AND/OR RECEIVED FROM THE GOVERNMENT
(NAVSEA) (APR 2004)
(a)
The Contractor agrees to test for
viruses all computer software and/or computer databases, as defined
in the clause entitled “RIGHTS IN NONCOMMERCIAL COMPUTER
SOFTWARE AND NONCOMMERCIAL COMPUTER SOFTWARE DOCUMENTATION”
(DFARS 252.227-7014), before delivery of that computer software or
computer database in whatever media and on whatever system the
software is delivered. The Contractor warrants that any such
computer software and/or computer database will be free of viruses
when delivered.
(b)
The Contractor agrees to test any
computer software and/or computer database(s) received from
the Government for viruses prior to use under this
contract.
(c)
Unless otherwise agreed in writing,
any license agreement governing the use of any computer software to
be delivered as a result of this contract must be paid-up and
perpetual, or so nearly perpetual as to allow the use of the
computer software or computer data base with the equipment for
which it is obtained, or any replacement equipment, for so long as
such equipment is used. Otherwise the computer software or
computer database does not meet the minimum functional requirements
of this contract. In the event that there is any routine to disable
the computer software or computer database after the software is
developed for or delivered to the Government, that routine shall
not disable the computer software or computer database until at
least twenty-five calendar years after the delivery date of the
affected computer software or computer database to the
Government.
17
(d)
No copy protection devices or
systems shall be used in any computer software or computer database
delivered under this contract to restrict or limit the Government
from making copies. This does not prohibit license agreements
from specifying the maximum amount of copies that can be
made.
(e)
Delivery by the Contractor to the
Government of certain technical data and other data is now
frequently required in digital form rather than as hard copy.
Such delivery may cause confusion between data rights and computer
software rights. It is agreed that, to the extent that any
such data is computer software by virtue of its delivery in digital
form, the Government will be licensed to use that digital-form with
exactly the same rights and limitations as if the data had been
delivered as hard copy.
(f)
Any limited rights legends or other
allowed legends placed by a Contractor on technical data or other
data delivered in digital form shall be digitally included on the
same media as the digital-form data and must be associated with the
corresponding digital-form technical data to which the legends
apply to the extent possible. Such legends shall also be
placed in human readable form on a visible surface of the media
carrying the digital-form data as delivered, to the extent
possible.
CONTRACTOR’S PROPOSAL (NAVSEA) (MAR
2001)
(a) Performance of this contract by the
Contractor shall be conducted and performed in accordance with
detailed obligations to which the Contractor committed itself in
Proposal entitled, “FLYWHEEL ENERGY STORAGE IN SUPPORT OF
NAVAL INTEGRATED POWER SYSTEMS” dated May 1,
2008 in response to NAVSEA Solicitation No. N00024-
05-R-4201 .
(b) The technical volume(s) of the
Contractor’s proposal is incorporated by reference and hereby
made subject to the provisions of the “ORDER OF
PRECEDENCE” (FAR 52.215-8) clause of this contract.
Under the “ORDER OF PRECEDENCE” clause, the technical
volume of the Contractor’s proposal referenced herein is
hereby designated as item (f) of the clause, following
“the specification” in the order of
precedence.
INFORMATION AND DATA FURNISHED BY THE GOVERNMENT
- ALTERNATE II (NAVSEA) (JAN 2008)
(a) NAVSEA Form 4340/2 or Schedule C,
as applicable, Government Furnished Information, attached hereto,
incorporates by listing or specific reference, all the data or
information which the Government has provided or will provide to
the Contractor except for -
(1) The specifications set
forth in Section C, and
(2) Government specifications,
including drawings and other Government technical documentation
which are referenced directly or indirectly in the specifications
set forth in Section C and which are applicable to this
contract as specifications, and which are generally available and
provided to Contractors or prospective Contractors upon proper
request, such as Federal or Military Specifications, and Standard
Drawings, etc.
(b) Except for the specifications referred
to in subparagraphs (a)(1) and (2) above, the Government
will not be obligated to provide to the Contractor any
specification, drawing, technical documentation or other
publication which is not listed or specifically referenced in
NAVSEA Form 4340/2 or Schedule C, as applicable,
notwithstanding anything to the contrary in the specifications, the
publications listed or specifically referenced in NAVSEA
Form 4340/2 or Schedule C, as applicable, the clause entitled
“GOVERNMENT PROPERTY” (FAR
18
52.245-1) or “GOVERNMENT PROPERTY
INSTALLATION OPERATION SERVICES “ (FAR 52.245-2), as
applicable, as applicable, or any other term or condition of this
contract.
(c)(1) The Contracting Officer may at any
time by written order:
(i) delete, supersede, or revise, in whole or in
part, data listed or specifically referenced in NAVSEA
Form 4340/2 or Schedule C, as applicable; or
(ii) add items of data or information to NAVSEA
Form 4340/2 or Schedule C, as applicable; or
(iii) establish or revise due dates for items of data
or information in NAVSEA Form 4340/2 or Schedule C, as
applicable.
(2) If any action taken by the
Contracting Officer pursuant to subparagraph
(c)(1) immediately above causes an increase or decrease in the
costs of, or the time required for, performance of any part of the
work under this contract, the contractor may be entitled to an
equitable adjustment in the contract amount and delivery schedule
in accordance with the procedures provided for in the
“CHANGES” clause of this contract.
USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL
CONTRACT FILES (NAVSEA) (APR 2004)
(a) NAVSEA may use a file room
management support contractor, hereinafter referred to as
“the support contractor”, to manage its file room,
in which all official contract files, including the official
file supporting this procurement, are retained. These
official files may contain information that is considered a trade
secret, proprietary, business sensitive or otherwise
protected pursuant to law or regulation, hereinafter referred
to as “protected information”. File room
management services consist of any of the following: secretarial or
clerical support; data entry; document reproduction, scanning,
imaging, or destruction; operation, management, or maintenance of
paper-based or electronic mail rooms, file rooms, or libraries; and
supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will
ensure that any NAVSEA contract under which these file
room management services are acquired will contain a
requirement that:
(1) The support contractor not
disclose any information;
(2) Individual employees are to
be instructed by the support contractor regarding the sensitivity
of the official contract files;
(3) The support contractor
performing these services be barred from providing any
other supplies and/or services, or competing to do so, to NAVSEA
for the period of performance of its contract
and for an additional three years thereafter unless
otherwise provided by law or regulation; and,
(4) In addition to any other
rights the contractor may have, it is a third party beneficiary who
has the right of direct action against the support contractor, or
any person to whom the support contractor has released or disclosed
protected information, for the unauthorized duplication, release,
or disclosure of such protected information.
(c) Execution of this contract by the
contractor is considered consent to NAVSEA’s permitting
access to any information, irrespective of restrictive markings or
the nature of the information submitted, by its file room
management support contractor for the limited purpose of
executing its file room support
contract responsibilities.
(d) NAVSEA may, without further notice,
enter into contracts with other contractors for these
services. Contractors are free to enter into separate
non-disclosure agreements with the file room contractor.
(Please contact Director, E
19
Business Division for contractor
specifics.) However, any such agreement will not be
considered a prerequisite before information submitted is stored in
the file room or otherwise encumber the government.
20
Section D - Packaging and
Marking
CLAUSES INCORPORATED BY FULL
TEXT
All unclassified data shall be prepared for
shipment in accordance with best commercial practice.
Classified reports, data, and documentation
shall be prepared for shipment in accordance with National
Industrial Security Program Operating Manual (NISPOM), DOD
5220.22-M dated 28 February 2006.
CLAUSES INCORPORATED BY FULL
TEXT
Item(s) 0001 - The supplies
furnished hereunder shall be packaged in accordance with best
commercial practice.
MARKING OF REPORTS (NAVSEA) (SEP
1990)
All reports delivered by the Contractor to the
Government under this contract shall prominently show on the cover
of the report:
(1) name and business address
of the Contractor
(2) contract number
(3) contract dollar
amount
(4) whether the contract was
competitively or non-competitively awarded
|
(5) sponsor:
|
JOSEPH TANNENBAUM
|
|
|
(Name of Individual Sponsor)
|
|
|
NAVSEA PMS-320
|
|
|
(Name of Requiring Activity)
|
|
|
WASHINGTON NAVY YARD, D.C. 20376
|
|
|
(City and State)
|
21
Section E - Inspection and
Acceptance
CLAUSES INCORPORATED BY
REFERENCE
|
52.246-3
|
Inspection Of Supplies
Cost-Reimbursement
|
MAY 2001
|
|
|
52.246-5
|
Inspection Of Services
Cost-Reimbursement
|
APR 1984
|
|
|
52.246-8
|
Inspection Of Research And
Development Cost Reimbursement
|
MAY 2001
|
|
|
52.246-16
|
Responsibility For
Supplies
|
APR 1984
|
|
CLAUSES INCORPORATED BY FULL
TEXT
Item(s) 0001 - Inspection and
acceptance shall be made by the Contracting Officer’s
Representative (COR) or a designated representative of the
Government.
Item 0002- Inspection and
acceptance of all data shall be as specified on the attached
Contract Data Requirements List(s), DD Form 1423.
Item(s) 0003 - Acceptance shall be
made by the cognizant ACO upon receipt of a copy of the
authorization for services and the original certification of
performance.
Item(s) 0001 - Acceptance shall be
made by the cognizant ACO upon receipt of a copy of the
authorization for services and the original certification of
performance.
22
Section F - Deliveries or
Performance
CLAUSES INCORPORATED BY
REFERENCE
|
52.242-15
|
Stop-Work Order
|
AUG 1989
|
|
|
52.242-15 Alt I
|
Stop-Work Order (Aug 1989) -
Alternate I
|
APR 1984
|
|
|
52.247-34
|
F.O.B. Destination
|
NOV 1991
|
|
CLAUSES INCORPORATED BY FULL
TEXT
The Contractor shall perform the work described
in SECTION C, at the level of effort specified in
SECTION B, as follows:
|
ITEM(S)
|
|
FROM
|
|
TO
|
|
|
|
|
|
|
|
0001
|
|
Date of award
|
|
12 Months after award
|
|
000101
|
|
Date of award
|
|
30 September 2009
|
|
0003
|
|
Date of award
|
|
36 Months after award
|
|
0004
|
|
Date of award
|
|
36 Months after award
|
All data to be furnished under this contract
shall be delivered prepaid to the destination(s) and at the
time(s) specified on the Contract Data Requirements List(s),
DD Form 1423.
23
Section G - Contract
Administration Data
CLAUSES INCORPORATED BY FULL
TEXT
CONTRACT ADMINISTRATION DATA
Enter below the address (street and number,
city, county, state and zip code) of the Contractor’s
facility which will administer the contract if such address is
different from the address shown on the SF 26 or SF 33, as
applicable.
CLAUSES INCORPORATED BY FULL
TEXT
|
CONTRACTING OFFICER’S
|
COMMANDER
|
|
REPRESENTATIVE:
|
ATTN: Joseph Tannenbaum
|
|
|
NAVAL SEA SYSTEMS COMMAND PMS 320
|
|
|
1333 ISAAC HULL AVENUE SE STOP 2203
|
|
|
WASHINGTON NAVY YARD DC 20376 -2203
|
|
|
Telephone No. 202/781-2629
|
|
|
Fax No. 202/781-4778
|
|
|
Email Address:
joseph.tannenbaum@navy.mil
|
The Contractor shall forward a copy of all
invoices to the Contracting Officer’s
Representative.
|
PURCHASING OFFICE
|
COMMANDER
|
|
REPRESENTATIVE:
|
ATTN: Timothy A. Starker
|
|
|
NAVAL SEA SYSTEMS COMMAND
|
|
|
1333 ISAAC HULL AVENUE SE STOP
|
|
|
WASHINGTON NAVY YARD DC 20376
|
|
|
Telephone No. 202/781-
3944
|
|
|
Fax No. 202/781-4637
|
|
|
Email Address:
timothy.starker@navy.mil
|
24
Section H - Special Contract
Requirements
CLAUSES INCORPORATED BY FULL
TEXT
NAVSEA 5252.202-9101 ADDITIONAL DEFINITIONS
(MAY 1993)
As used throughout this contract, the following
terms shall have the meanings set forth below:
(a) DEPARTMENT means the
Department of the Navy.
(b) REFERENCES TO THE FEDERAL ACQUISITION
REGULATION (FAR) All references to the FAR in this
contract shall be deemed to also reference the appropriate sections
of the Defense FAR Supplement (DFARS), unless clearly indicated
otherwise.
(c) REFERENCES TO ARMED SERVICES
PROCUREMENT REGULATION OR DEFENSE ACQUISITION
REGULATION All references in this document to either
the Armed Services Procurement Regulation (ASPR) or the Defense
Acquisition Regulation (DAR) shall be deemed to be references to
the appropriate sections of the FAR/DFARS.
(d) NATIONAL STOCK NUMBERS
Whenever the term Federal Item Identification Number and its
acronym FIIN or the term Federal Stock Number and its acronym FSN
appear in the contract, order or their cited specifications and
standards, the terms and acronyms shall be interpreted as National
Item Identification Number (NIIN) and National Stock Number (NSN)
respectively which shall be defined as follows:
(1) National Item
Identification Number (NIIN). The number assigned to each
approved Item Identification under the Federal Cataloging
Program. It consists of nine numeric characters, the first
two of which are the National Codification Bureau (NCB) Code.
The remaining positions consist of a seven digit non
significant number.
(2) National Stock Number
(NSN). The National Stock Number (NSN) for an item of supply
consists of the applicable four position Federal Supply
Class (FSC) plus the applicable nine position NIIN assigned to
the item of supply.
CLAUSES INCORPORATED BY FULL
TEXT
5252.216-9122 LEVEL OF EFFORT (DEC
2000)
(a) The Contractor agrees to provide the
total level of effort specified in the next sentence in performance
of the work described in Sections B and C of this contract.
The total level of effort for the performance of this contract
shall be 10,000 total man-hours of direct labor, including
subcontractor direct labor for those subcontractors specifically
identified in the Contractor’s proposal as having hours
included in the proposed level of effort.
(b) Of the total man-hours of direct labor
set forth above, it is estimated that 0 (Offeror to fill-in)
man-hours are uncompensated effort.
Uncompensated effort is defined as hours
provided by personnel in excess of 40 hours per week without
additional compensation for such excess work. All other
effort is defined as compensated effort. If no effort is
indicated in the first sentence of this paragraph, uncompensated
effort performed by the Contractor shall not be counted in
fulfillment of the level of effort obligations under this
contract.
25
(c) Effort performed in fulfilling the
total level of effort obligations specified above shall only
include effort performed in direct support of this contract
and shall not include time and effort expended on such things as
(local travel to and from an employee’s usual work location),
uncompensated effort while on travel status, truncated lunch
periods, work (actual or inferred) at an employee’s residence
or other non-work locations (except as provided in paragraph
(j) below), or other time and effort which does not have a
specific and direct contribution to the tasks described in Sections
B and C.
(d) The level of effort for this contract
shall be expended at an average rate of approximately
hours per week. It is understood and agreed that the rate of
man-hours per month may fluctuate in pursuit of the technical
objective, provided such fluctuation does not result in the use of
the total man-hours of effort prior to the expiration of the term
hereof, except as provided in the following paragraph.
(e) If, during the term hereof, the
Contractor finds it necessary to accelerate the expenditure of
direct labor to such an extent that the total man-hours of effort
specified above would be used prior to the expiration of the term,
the Contractor shall notify the Contracting Officer in writing
setting forth the acceleration required, the probable benefits
which would result, and an offer to undertake the acceleration at
no increase in the estimated cost or fee together with an offer,
setting forth a proposed level of effort, cost breakdown, and
proposed fee, for continuation of the work until expiration of the
term hereof. The offer shall provide that the work proposed
will be subject to the terms and conditions of this contract and
any additions or changes required by then current law, regulations,
or directives, and that the offer, with a written notice of
acceptance by the Contracting Officer, shall constitute a binding
contract. The Contractor shall not accelerate any effort
until receipt of such written approval by the Contracting
Officer. Any agreement to accelerate will be formalized by
contract modification.
(f) The Contracting Officer may, by
written order, direct the Contractor to accelerate the expenditure
of direct labor such that the total man-hours of effort specified
in paragraph (a) above would be used prior to the expiration
of the term. This order shall specify the acceleration
required and the resulting revised term. The Contractor shall
acknowledge this order within five days of receipt.
(g) If the total level of effort specified
in paragraph (a) above is not provided by the Contractor
during the period of this contract, the Contracting Officer, at its
sole discretion, shall either (i) reduce the fee of this
contract as follows:
|
Fee Reduction = Fee (Required LOE
- Expended LOE )
|
|
|
Required LOE
|
|
or (ii) subject to the provisions of the
clause of this contract entitled “LIMITATION OF COST”
(FAR 52.232-20) or “LIMITATION OF COST (FACILITIES)”
(FAR 52.232-21), as applicable, require the Contractor to continue
to perform the work until the total number of man-hours of direct
labor specified in paragraph (a) above shall have been
expended, at no increase in the fee of this contract.
(h) The Contractor shall provide and
maintain an accounting system, acceptable to the Administrative
Contracting Officer and the Defense Contract Audit Agency (DCAA),
which collects costs incurred and effort (compensated and
uncompensated, if any) provided in fulfillment of the level of
effort obligations of this contract. The Contractor shall
indicate on each invoice the total level of effort claimed during
the period covered by the invoice, separately identifying
compensated effort and uncompensated effort, if any.
(i) Within 45 days after completion of the
work under each separately identified period of performance
hereunder, the Contractor shall submit the following information in
writing to the Contracting Officer with copies to the cognizant
Contract Administration Office and to the DCAA office to which
vouchers are submitted: (1) the total number of
man-hours of direct labor expended during the applicable period;
(2) a breakdown of this total showing the number of man-hours
expended in each direct labor classification and associated direct
and indirect costs; (3) a breakdown of other costs incurred;
and (4) the Contractor’s estimate of the total allowable
cost incurred under the contract for the period. Within 45
days after completion of the work under the contract, the
Contractor shall submit, in addition, in the case of a cost
underrun; (5) the amount by which the estimated cost of this
contract may be
26
reduced to recover excess funds and, in the case
of an underrun in hours specified as the total level of effort; and
(6) a calculation of the appropriate fee reduction in
accordance with this clause. All submissions shall include
subcontractor information.
(j) Unless the Contracting Officer
determines that alternative worksite arrangements are detrimental
to contract performance, the Contractor may perform up to 10% of
the hours at an alternative worksite, provided the Contractor has a
company-approved alternative worksite plan. The primary
worksite is the traditional “main office” worksite. An
alternative worksite means an employee’s residence or a
telecommuting center. A telecommuting center is a
geographically convenient office setting as an alternative to an
employee’s main office. The Government reserves the right to
review the Contractor’s alternative worksite plan. In the
event performance becomes unacceptable, the Contractor will be
prohibited from counting the hours performed at the alternative
worksite in fulfilling the total level of effort obligations of the
contract. Regardless of work location, all contract terms and
conditions, including security requirements and labor laws, remain
in effect. The Government shall not incur any additional cost
nor provide additional equipment for contract performance as a
result of the Contractor’s election to implement an
alternative worksite plan.
(k) Notwithstanding any of the provisions
in the above paragraphs, the Contractor may furnish man-hours up to
five percent in excess of the total man-hours specified in
paragraph (a) above, provided that the additional effort is
furnished within the term hereof, and provided further that no
increase in the estimated cost or fee is required.
NAVSEA 5252.227-9113 GOVERNMENT-INDUSTRY
DATA EXCHANGE PROGRAM (OCT 2006)
(a) The Contractor shall participate in the
appropriate interchange of the Government-Industry Data Exchange
Program (GIDEP) in accordance with NAVSEA S0300-BU-GYD-010 dated
November 1994. Data entered is retained by the program
and provided to qualified participants. Compliance with this
requirement shall not relieve the Contractor from complying with
any other requirement of the contract.
(b) The Contractor agrees to insert
paragraph (a) of this requirement in any subcontract hereunder
exceeding $500,000.00. When so inserted, the word
“Contractor” shall be changed to
“Subcontractor”.
(c) GIDEP materials, software and
information are available without charge from:
GIDEP
P.O. Box 8000
Corona, CA 92878-8000
Phone: (951)
898-3207
FAX: (951)
898-3250
Internet: http://www.gidep.org
5252.232-9104 ALLOTMENT OF FUNDS (JAN
2008)
(a) This contract is incrementally funded
with respect to both cost and fee. The
amount(s) presently available and allotted to this contract
for payment of fee for incrementally funded contract line item
number/contract subline item number (CLIN/SLIN), subject to the
clause entitled “FIXED FEE” (FAR
27
52.216-8) or “INCENTIVE FEE” (FAR
52.216-10), as appropriate, is